Deze draaiende Derwishen gezien in de Event Hall van het Sirkeci treinstation van Istanbul.
Op heterdaad betrapt …
Deze kereltjes maken een hels lawaai met de lege metalen eetbakjes van de kat.
Shivoham’s surbahar
Shivoham finally came to collect his surbahar.
The instrument has been ordered some years ago and has been finished while I was in New Delhi, in november 2005.
At that time I arranged a shipment that arrived at my house in june 2006. The surbahar was packed in one of these crates.
Finally another 3…
Day 16, 17 & 18 : Cutting out these 2 necks is very tough. The African mahoganies texture changes frequently it’s direction. One of the necks is cut out with a miller.
Repair completed
Tumba repair completed.
New strings fitted and jiwari adjusted.
Here a picture about the soundboard (tabli).
Brandhout 1
Tijdje zoet geweest met het binnenhalen van de “oogst” brandhout.
Vele winterse zaterdagen in het bos hout gehakt. Bomen vellen, afmeten, verzagen, klieven en op hopen leggen.
Nu is het tijd om met de boskarren van hoop naar hoop te rijden en het hout op te laden. De karren zijn redelijk hoog geladen en er moet zeer voorzichtig mee gereden worden.
Daar zijn ze weer…
En deze keer hebben ze ons wel gezien…
Zouden ze nog eens komen ??
Twee kleine reetjes
Deze twee waagden zich wel erg kort bij ons huisje..
Ze keken de verkeerde kant op.
And another 3…
Day 13 & 14 : Working on the neck’s backside profile. Drawing the second cut’s borders and removing the wood. Drawing the neck’s inside borders and cutting out the wood with a gouge.
Day 15 : Continuing the neck’s cutting out.
The neck’s backside is now made of 7 surfaces. I didn’t touch the border between the neck and head to be able to clamp the piece.
First neck’s cut out is completed.
Joint Repair
Page added documenting the repair of a joint… Take a look here !!